RECONSTRUCTION OF ZAGREBAČKA AVENIJA IN ZAGREB
MAIN DATA AND AMOUNTS OF EXECUTED WORKS
- Length of the reconstructed avenue: 5 000 m
- Demolition of the existing asphalt pavement: 31 050 m2
- Milling of the existing asphalt: 113 050 m2
- Excavation of humus: 66 750 m2
- Bulk excavation in “C” category material: 66 550 m3
- Construction of bedding: 54 970 m2
- Disposition of geotextile: 31 630 m2
- Construction of stone material embankment: 55 200 m3
- Construction of sub-base layers(25 and 40 cm thick): 18 170 m3
- Cement stabilization 20 cm: 24 850 m2
- Wire-mash reinforcement for asphalt: 92 000 m2
- Prefabricated concrete curbs: 12 880 m
- Construction of asphalt layers on the pavement (roadbase 8 cm, basecourse 5 cm): 24 880 m2
- Construction of the wearing course, type SMA 4 cm: 137 940 m2
- Construction of asphalt layers on pedestrian roads (base and wearing layers 5+3 cm thick): 30 140 m2
- Construction of a catch basin with outlet pipes: 138 pieces