RUPA – RIJEKA HIGHWAY, SECTION: PERMANI - RUPA

BASIC CHARACTERISTICS OF CONSTRUCTION WORKS FROM KM 13+000 TO KM 17+800
CLIENT:HRVATSKE AUTOCESTE d.o.o.
LEAD PARTNER IN J. VENTURE:VIADUKT d.d.
CONTRACT:
No.45212-400-2291/04 (G-21/2004) of April 13, 2004

No.45212-400-2291/04/2/05 (G-88/2005) of December 1, 2005
CONSTRUCTION PERIOD:
2004. - 2006.
VALUE OF CONTRACT:
42 188 073 EUR
(FOR VIADUKT d.d.:
22 180 862 EUR)



MAIN DATA AND AMOUNTS OF EXECUTED WORKS
WORKS EXECUTED BY VIADUKT d.d. ZAGREB

The roadway of the highway from km 13+000 to km 16+875 (3875 m), roadside service facility, railroad underpass Miklavić 2 and overpass Miklavić 3 (782 m2), 18 pieces of prefabricated girders for the Rupa overpass, and overpass and water supply facilities.

Key and significant amounts of executed works:

  • Bulk excavation in A and B category materials: 332 470 m3
  • Embankment of mixed and stone material: 312 482 m3
  • Bed: 84 824m2
  • Sub-base layers (12.5 and 40 cm): 31 457 m3
  • 9cm thick loadbearing roadbase: 41 926 m2