RUPA – RIJEKA HIGHWAY, SECTION: PERMANI - RUPA
- BASIC CHARACTERISTICS OF CONSTRUCTION WORKS FROM KM 13+000 TO KM 17+800
- CLIENT:HRVATSKE AUTOCESTE d.o.o.
- LEAD PARTNER IN J. VENTURE:VIADUKT d.d.
- CONTRACT:
- No.45212-400-2291/04 (G-21/2004) of April 13, 2004
No.45212-400-2291/04/2/05 (G-88/2005) of December 1, 2005
- CONSTRUCTION PERIOD:
- 2004. - 2006.
- VALUE OF CONTRACT:
- 42 188 073 EUR
(FOR VIADUKT d.d.:
22 180 862 EUR)

MAIN DATA AND AMOUNTS OF EXECUTED WORKS
WORKS EXECUTED BY VIADUKT d.d. ZAGREB
The roadway of the highway from km 13+000 to km 16+875 (3875 m), roadside service facility, railroad underpass Miklavić 2 and overpass Miklavić 3 (782 m2), 18 pieces of prefabricated girders for the Rupa overpass, and overpass and water supply facilities.
Key and significant amounts of executed works:
- Bulk excavation in A and B category materials: 332 470 m3
- Embankment of mixed and stone material: 312 482 m3
- Bed: 84 824m2
- Sub-base layers (12.5 and 40 cm): 31 457 m3
- 9cm thick loadbearing roadbase: 41 926 m2