BRIDGE "BAJER" RIJEKA - ZAGREB HIGHWAY

SECTION OŠTROVICA - VRATA
INVESTOR:HIDROELEKTRA NISKOGRADNJA
MAIN CONTRACTOR:VIADUKT d.d.
CONTRACT:
G-170/95
CONSTRUCTION PERIOD:
1992.- 1995.
CONSTRUCTION VALUE:
7 340 000 EUR



  • Total length of the bridge: 520 m
  • Width of the bridge: 12.05 m
  • Structure: prefabricated box structure built using the incremental launching method
  • Bridge spans: 42.63 m + 8 x 50.16 m + 42.63 m
  • For the first time in Croatia a bridge was build by incremental launching of the prestressed structure without auxiliary columns
  • A rigid structure was selected, that is, a 4 m high and 5.1 m wide box
  • A deck slab is 0.25 m thick, with reinforcements (vutas) next to ridges
  • Rectangular hollow bridge piers, 6.6 m x 3.1 m, with 0.3 m thick walls
  • Bridge piers in the lake are founded on 6 drilled piles of 1.5 m diameter