THE NEW JANKOMIR BRIDGE CROSSING THE RIVER SAVA

THE NEW JANKOMIR BRIDGE AT THE WEST ENTRANCE TO ZAGREB
CLIENT:TOWN MANAGEMENT FOR PHYSICAL PLANNING, ENVIRONMENT PROTECTION, URBAN DEVELOPMENT, UTILITIES AND TRAFFIC
MAIN CONTRACTOR:VIADUKT d.d.
CONTRACT:
622/05-1; G-36/2005.
June 7, 2005
CONSTRUCTION PERIOD:
2005. - 2006.
CONSTRUCTION VALUE:
9 804 819.84 EUR



  • Total length: 365.55 m
  • Total width: 11.3 m
  • Total surface area: 4 130.7 m2
  • The span construction consists of two main steel "I" girders of 225 cm, reinforced with a reinforced concrete slab of variable thickness from 25 to 35 cm
  • Pile-supported bridge.