OVERPASS OVER THE RAILROAD IN ZAPREŠIĆ

SECTION "A", RIGHT LANE OF THE ZAGREB - MACELJ HIGHWAY
CLIENT:PYHRN MOTORWAY GmbH
MAIN SUBCONTRACTOR:VIADUKT d.d.
CONTRACT:
G-66/2004
22. srpnja 2004.
CONSTRUCTION PERIOD:
2005. - 2006.
CONSTRUCTION VALUE:
3 244 363 EUR


  • Total length of the overpass: 378.26 m
  • Overpass width: 14.2 m
  • Total surface area of the overpass: 5.371,3 m2
  • Span structure: prefabricated AB "I" girders with a monolithic AB slab d = 25 cm
  • Pile-supported overpass.