VIADUCT "MOKRICE" ZAGREB - SPLIT HIGHWAY

SECTION PIROVAC – SKRADIN
CLIENT:HRVATSKE AUTOCESTE d.o.o.
MAIN CONTRACTOR:VIADUKT d.d.
CONTRACT:
45212-400-4365/2004.
June 24, 2004
CONSTRUCTION PERIOD:
2005.
CONSTRUCTION VALUE:
8 927 806 EUR


  • Total length: 344.1 m
  • Width of the viaduct: 2 x 13.85 m
  • Surface area of the viaduct: 9 448.5 m2
  • Structure: prestressed AB "I" girders of 200 cm + AB slab of 22 cm
  • Viaduct spans - right 38.05 + 6 x 40 + 38.05 m
  • Viaduct spans – left 38.05 + 6 x 40 + 38.05 m
  • Pier height- right from 15.45 m to 41.43 m
  • Pier height – left from 16.90 m too 41.42m