TUNNEL "DUBRAVE" ZAGREB - SPLIT HIGHWAY
- BASIC CHARACTERISTICS OF THE TUNNEL, SECTION: VRPOLJE - PRGOMET
- CLIENT:HRVATSKE AUTOCESTE d.o.o.
- MAIN CONTRACTOR:VIADUKT d.d.
- CONTRACT:
- 45212-400-4394/2003;
G-91/2003
of August 7, 2003
45212-400-4394/03/1/04
of June 21, 2004
- CONSTRUCTION PERIOD:
- 2003. - 2004.
- CONSTRUCTION VALUE:
- 5 035 621 EUR

- Total length of the tunnel tubes: 1600 m
- Cross-section of the excavation: 75 - 85 m2
- Method of excavation: NATM, drilling + shot firing
- Excavation category according to RMR classification: II - V
- Two tubes: 810 m and 790 m long
- VIADUKT d.d. excavated and performed cladding for 702 meters of the tunnel