TUNNEL "DUBRAVE" ZAGREB - SPLIT HIGHWAY

BASIC CHARACTERISTICS OF THE TUNNEL, SECTION: VRPOLJE - PRGOMET
CLIENT:HRVATSKE AUTOCESTE d.o.o.
MAIN CONTRACTOR:VIADUKT d.d.
CONTRACT:
45212-400-4394/2003;
G-91/2003
of August 7, 2003
45212-400-4394/03/1/04
of June 21, 2004
CONSTRUCTION PERIOD:
2003. - 2004.
CONSTRUCTION VALUE:
5 035 621 EUR


  • Total length of the tunnel tubes: 1600 m
  • Cross-section of the excavation: 75 - 85 m2
  • Method of excavation: NATM, drilling + shot firing
  • Excavation category according to RMR classification: II - V
  • Two tubes: 810 m and 790 m long
  • VIADUKT d.d. excavated and performed cladding for 702 meters of the tunnel