HIGHWAY FROM THE JUNCTION SVETI ROK TO THE NORTHERN PPORTAL OF THE TUNNEL
MAIN DATA AND AMOUNTS OF EXECUTED WORKS
WORKS EXECUTED BY VIADUKT d.d. ZAGREB
- Length of the constructed roadway of the highway: 7 470 m
- Excavation of loose surface soil: 21 800 m3
- Bulk excavation in “A” and “B” category of material: 679 200 m3
- Borrow pit excavation: (“A” and “B” category) 205 800 m3
- Formation soil adaptation: 75 200 m2
- Embankment construction: 880 300 m3
- Bed: 222 500 m2
- Humusing 20 cm: 31 000 m2
- Cladding of the cut with stone material: 25 300 m3
- Dewatering with polyester pipes with the diameter of 300 to 800 mm: 6.156 m
- Outlets of polyester pipes with 50 cm diameter: 163 pieces