TUNNEL "BREZIK" ZAGREB - SPLIT HIGHWAY

BASIC CHARACTERISTICS OF THE TUNNEL, III C2 ŽUTA LOKVA - LIČKO LEŠĆE
CLIENT:HRVATSKE CESTE d.o.o.
MAIN CONTRACTOR:VIADUKT d.d.
CONTRACT:
45212-400-28586/2002.;
G-153/2002 signed on November 20, 2002
CONSTRUCTION PERIOD:
2003. - 2004.
CONSTRUCTION VALUE:
9 050 326 EUR



  • Total length of the tunnel tubes: 844 m
  • Cross-section of the excavation: 75 - 85 m2
  • Excavation method: NATM, drilling + shot firing
  • Excavation category according to RMR classification: III - V
  • Two tubes: 435 and 409 m long
  • Tunnel is located in urban zone, limited excavation zone (of 1 - 2.5 m)
  • Construction conditions subject to strict environmental restrictions due the vicinity of a river and drinking water wells.