TUNNEL "TUHOBIĆ" ZAGREB - RIJEKA HIGHWAY
- Total length of the tunnel: 2141 m
- Excavation performed by VIADUKT: 1120 m
- Cross-section of the excavation: 75 - 85 m2
- MMethod of excavation: NATM, drilling + shot firing
- Excavation category according to RMR classification: II-V
- Viadukt d.d. constructed the eastern side of the tunnel. The tunnel was excavated in limestone rock and dolomites with several large caverns partially filled with non-consolidated rock blocks and earth. The category of the rock mass strength often changes.