TUNNEL "VELIKI GLOŽAC" RIJEKA - ZAGREB HIGHWAY
- Total length of the right tube: 1130 m
- Cross-section of the excavation: 75 126 m2
- Method of excavation: NATM, drilling + shot firing
- Excavation category according to RMR classification: II-V
- Limited excavation zone due to the existing left tube open for traffic (1 - 2.5 m), constant monitoring of seismic activity in the existing tube.
- Tunnel was excavated mostly in hard rock; two large caverns were discovered during the excavation, one of which required the construction of a small „BRIDGE" inside the tunnel.