TUNNEL "ZARANAČ" ZAGREB - SPLIT HIGHWAY
- BASIC CHARACTERISTICS OF THE TUNNEL, SECTION: DUGOPOLJE - BISKO
- CLIENT:HRVATSKE AUTOCESTE d.o.o
- MAIN CONTRACTOR:VIADUKT d.d.
- CONTRACT:
- 45212-400-5205/04;
G-76/2004
as of April 27, 2004 and
45212-400-5205/04/1/05;
G-46/2005
as of July 4, 2005
- CONSTRUCTION PERIOD:
- 2003. - 2004.
- CONSTRUCTION VALUE:
- 7 358 186 EUR

- Total length of the tunnel tubes: 724 m
- Cross-section of the excavation: 75 - 85 m2
- Method of excavation: NATM, drilling + shot firing
- Excavation category according to RMR classification: III - V
- Two tubes: 399 m and 325 m long
- Tunnel is located in urban zone, excavation under the main sewer, very limited excavation zone (1 - 2.5 m), constant monitoring of seismic activity.